Difference between revisions of "Creating a new operation PWL"
Jump to navigation
Jump to search
(→Step-by-step description) |
m (→Functionality tested by) |
||
Line 49: | Line 49: | ||
* Date: Nov. 30, 2013 / John Kelly / QA Server / Version 3.0.0 | * Date: Nov. 30, 2013 / John Kelly / QA Server / Version 3.0.0 | ||
− | [[Category: | + | [[Category:PWL]] |
Revision as of 10:36, 3 December 2013
REQUIREMENTS | |
Permission | Operation administrator and higher |
Connectivity | Online |
This document describes how to create an operation PWL in the infoex system.
Background
An Operation PWL is a locally defined snowpack layer. The dating, description and name of the PWL is specific to a single operation.
The following information assumes you are logged in to the InfoEx application and you have selected an operation (if you have more than one valid operation).
Step-by-step description
1. | Activate the PWL menu from the main infoEx menu. | ||||||||||||
2. | Select 'Operation PWL' beneath 'Pwl' (Fig. 1). The current list of Operation PWLs is displayed. | ||||||||||||
3. | Select beneath the 'Operation PWL' title. This will open a popup window where you can provide the baseline information for your Operation PWL. | ||||||||||||
4. | Provide the following information for your Operation PWL (see Fig. 2)
|
Related documents
Functionality tested by
- Date: Nov. 30, 2013 / John Kelly / QA Server / Version 3.0.0