REQUIREMENTS |
Permission |
Operation administrator and higher |
Connectivity |
Online |
This document describes how to create an operation PWL in the infoex system.
Background
An Operation PWL is a locally defined snowpack layer. The dating, description and name of the PWL is specific to a single operation.
The following information assumes you are logged in to the InfoEx application and you have selected an operation (if you have more than one valid operation).
Step-by-step description
1.
|
Activate the PWL menu from the main infoEx menu.
|
2.
|
Fig. 1: Creating an Operation PWL Select 'Operation PWL' beneath 'Pwl' (Fig. 1). The current list of Operation PWLs is displayed.
|
3.
|
Fig. 2: Operation PWL settings Select beneath the 'Operation PWL' title. This will open a popup window where you can provide the baseline information for your Operation PWL.
|
4.
|
Provide the following information for your Operation PWL (see Fig. 2)
Name:
|
Provide a meaningful name for your Operation PWL.
|
Date:
|
Provide the date that your Operation PWL was buried.
|
Comment:
|
Provide a descriptive comment for your community PWL, if desired.
|
Community PWL:
|
You may link your Operation PWL to a Community PWL (see: Community PWLs)
NOTE |
Linking your Operation PWL to a Community PWL allows you to retain your local definition and description of the PWL while allowing it to be linked with the same PWL observed in other infoEx operations |
|
Colour:
|
Provide a colour that will identify your PWL in hazard assessments.
|
|
Related documents
Functionality tested by
- Date: Nov. 30, 2013 / John Kelly / QA Server / Version 3.0.0