Creating a new operation PWL
Jump to navigation
Jump to search
REQUIREMENTS | |
Permission | Operation administrator and higher |
Connectivity | Online |
This document describes how to create an operation PWL in the infoex system.
Background
An Operation PWL is a locally defined snowpack layer. The dating, description and name of the PWL is specific to a single operation.
The following information assumes you are logged in to the InfoEx application and you have selected an operation (if you have more than one valid operation).