Difference between revisions of "Creating a new operation PWL"
Jump to navigation
Jump to search
(Created page with "__NOTOC__ {{Requirements|UserLevel=Operation administrator and higher|Connectivity=Online}} This document describes how to create an operation PWL in the infoex system. ==Bac...") |
(No difference)
|
Revision as of 16:35, 30 November 2013
REQUIREMENTS | |
Permission | Operation administrator and higher |
Connectivity | Online |
This document describes how to create an operation PWL in the infoex system.
Background
An Operation PWL is a locally defined snowpack layer. The dating, description and name of the PWL is specific to a single operation.
The following information assumes you are logged in to the InfoEx application and you have selected an operation (if you have more than one valid operation).