Difference between revisions of "Map view layer: Time slider"

From InfoEx Help Information
Jump to navigation Jump to search
(Functionality)
Line 11: Line 11:
  
 
==Functionality==
 
==Functionality==
* Click on the Operation overview checkbox in the layer hierarchy panel to show/hide this layer on the map.
+
* Click and hold and move the left date/time handle to the start time of the period you are interested in. Click and hold and move the right date/time handle to the end time of the period you are interested in. This will set the view to the number of days or hours you select depending on the start and end time (Fig 2).
* Click on the operation name in the layer hierarchy panel to directly zoom the map to its [[Location types and symbology#OperationArea|operation area]].
+
* Step forward or back using the right arrow or left arrow at either end of the time bar.
* Click on the check box next to the operation name in the layer hierarchy panel to show/hide the outline of its [[Location types and symbology#OperationArea|operation area]] on the map.
+
* Click on the play icon to automatically step forward.
* Click on the [[Location types and symbology#OperationArea|operation area]] of an operation on the map to view the operation name.
+
* Click and hold and move the greyed out selection on the time bar to move it manually.
  
 
==Related documents==
 
==Related documents==

Revision as of 09:51, 5 June 2017

REQUIREMENTS
Permission All users
Connectivity Online only

This document describes the functionality of the Time slider used in the Map view of the InfoEx report.

The goal of the Time slider is to control display of the map view information for time breakdowns within the selected report date range. InfoEx reports can be selected for multiple days using the Date Range input box.

Layout

Fig. 1: Time slider for multi day report displaying the full report information.

The time slider is displayed at the bottom left of the map view of InfoEx reports.

Functionality

  • Click and hold and move the left date/time handle to the start time of the period you are interested in. Click and hold and move the right date/time handle to the end time of the period you are interested in. This will set the view to the number of days or hours you select depending on the start and end time (Fig 2).
  • Step forward or back using the right arrow or left arrow at either end of the time bar.
  • Click on the play icon to automatically step forward.
  • Click and hold and move the greyed out selection on the time bar to move it manually.

Related documents

Functionality tested by

  • Jan. 2, 2014: Pascal Haegeli